Addition framing continues for kitchen in Westend of Henrico Co

Here is a photo of the completed addition framing for a new 9' x 33' kitchen addition and playroom in Henrico Va.

We first removed the existing rear deck for our new kitchen addition. The footing trenches are 20" in width and depth.

Concrete for the footing is a 3000 PSI ready mixed and placed in the trench.

S.B. Cox supplied the concrete for this project. http://www.coxreadymix.com/

The Brick and block foundation for this kitchen remodeling project was supplied by Southside Builders supply. http://www.southsidebuilders.com/

Anchor bolts were installed in the foundation for the pressure treated sill plates to be bolted down.

The floor joist are 2 x 10 covered with OSB subflooring that was glued and screwed down.

Walls are framed with 2 x 4 studs and are continuously sheathed with OSB plywood.

Rafters are 2 x 10's for new required insulation values.

This project has a 9' ceiling height and have a 3/12 shed roof design.

Below is a photo of the 22' steel beam being lifted into place for removing the rear wall.

This kitchen addition will entail removing approximately 21' of the 1st floor rear wall for a wide open floor plan.

Additions that we have been working on are at. https://rbmremodels.com/what-we-do/additions/ or https://rbmremodels.com/?s=addition&submit=Search

Contact RBM for a free estimate on your next remodeling project. https://rbmremodels.com/contact/

More photos of this project are coming soon so check back often.

Steel beam for 2nd floor support
Photo of steel beam being hoisted in place

Roof sheathing being installed
New addition roof framing being completed

Kitchen addition framing start photos in Westend of Henrico Co

Here is a photo of the completed addition footings and the framing started for a new 9' x 33' kitchen addition and playroom in Henrico Va.

We first removed the existing rear deck for our new kitchen addition. The footing trenches are 20" in width and depth.

Concrete for the footing is a 3000 PSI ready mixed and placed in the trench.

S.B. Cox supplied the concrete for this project. http://www.coxreadymix.com/

The Brick and block foundation for this kitchen remodeling project was supplied by Southside Builders supply. http://www.southsidebuilders.com/

Anchor bolts were installed in the foundation for the pressure treated sill plates to be bolted down.

The floor joist are 2 x 10 covered with OSB subflooring that was glued and screwed down.

Walls are framed with 2 x 4 studs and are continuously sheathed with OSB plywood.

This project has a 9' ceiling height and have a 3/12 shed roof design.

This kitchen addition will entail removing approximately 21' of the 1st floor rear wall for a wide open floor plan.

Additions that we have been working on are at. https://rbmremodels.com/what-we-do/additions/ or https://rbmremodels.com/?s=addition&submit=Search

Contact RBM for a free estimate on your next remodeling project. https://rbmremodels.com/contact/

More photos of this project are coming soon so check back often.

Addition framing is being built
Foundation is completed and wall framing is on going

 

Kitchen addition footing photos in Westend of Henrico Co

Here is a photo of the completed addition footings for a new 9' x 33' kitchen addition and playroom in Henrico Va.

We first removed the existing rear deck for our new kitchen addition. The footing trenches are 20" in width and depth.

Concrete for the footing is a 3000 PSI ready mixed and placed in the trench.

S.B. Cox supplied the concrete for this project. http://www.coxreadymix.com/

This kitchen addition will entail removing approximately 21' of the 1st floor rear wall for a wide open floor plan.

This project will have a standard 9' ceiling height and have a 3/12 shed roof design.

The foundation will be installed soon so check back often.

Additions that we have been working on are at. https://rbmremodels.com/what-we-do/additions/ or https://rbmremodels.com/?s=addition&submit=Search

Contact RBM for a free estimate on your next remodeling project.

Deck is removed and ground is marked for new kitchen addition
Rear deck has been removed from home for new kitchen addition

Concrete has been poured for new kitchen addition
Footings for new kitchen addition have been dug and concrete poured

 

Front porch roof in Glen Allen has started

This front porch project started as an uncovered masonry porch. We are adding a covered roof to the existing porch The roof is being framed with a barrel ceiling and consists of 2 x 8 beams, 2 x 6 rafters and OSB roof sheathing. 10" round fiberglass columns are being used to support the new porch roof. http://www.hbgcolumns.com/ You can check out more front porches on our web page at...https://rbmremodels.com/?s=front+porch&submit=Search The roofing that we will post soon is an architectural matching shingle by GAF. http://www.gaf.com/ Contact us for a free estimate on your next remodeling project.
Front porch photo before work began
Front porch photo before work began
Front porch being framed up
Porch roof being framed up

Photos of siding, vinyl railings and deck extension at new 24′ X 30′ addition in Chesterfield Co

Here are some exterior photos of an addition project in the Midlothian area of Chesterfield Co. We have added 6' x 12' deck extension to the existing covered porch area. Both front and rear porches have PVC railings with interior aluminum stiffeners. Vinyl siding for this addition is Norandex Shenandoah semi-beaded vinyl siding in the color of Sierra. Contact us for a free estimate on these products or an addition on your home. More updates are coming daily on this and other projects daily.
addition
Front view of addition
addition
Rear view of new addition and porch area

Progress photo of siding at new 24′ X 30′ addition in Chesterfield Co

Here are more progress photos of an addition project in the Midlothian area of Chesterfield Co. Siding for this addition is Norandex Shenandoah semi-beaded vinyl siding in the color of Sierra. We are using PVC aluminum trim coil for all fascia and rakes. Matching vinyl soffit material is being used for all overhangs and ceilings. More updates are coming daily on this and other projects daily. Contact us for a free consultation for your next remodeling project.
Front of new addition
Photo from rear of new addition

Siding has started at new 24′ X 30′ addition in Chesterfield Co

Here are more progress photos of an addition project in the Midlothian area of Chesterfield Co. Siding for this addition is Norandex Shenandoah semi-beaded vinyl siding in the color of Sierra. We are using PVC aluminum trim coil for all fascia and rakes. Matching vinyl soffit material is being used for all overhangs and ceilings. More updates are coming daily on this and other projects daily. Contact us for a free consultation for your next remodeling project.
Vinyl siding is being installed at new addition

Roof is completed at new 24′ X 30′ addition in Chesterfield Co

Here are more progress photos of an addition project in the Midlothian area of Chesterfield Co. We have finished the roofing which is a Tamko 3-tab Weathered wood asphalt based shingle. With all of our roofing projects Ice and water guard is installed at the overhangs and ridge vent at the peak. RBM will be featuring even more on the siding and interior of this addition and other projects so check back soon. Contact us for a free consultation for your next remodeling project.
Photo of new addition with 3-tab shingles installed
Another photo of addition with roof installed and ready for vinyl siding

Another framing update at new 24′ X 30′ addition in Chesterfield Co

Here are more progress framing photos of an addition project in the Midlothian area of Chesterfield Co. This addition is a 24' x 30'  in-law suite and will include access to the existing living room and kitchen. Sill plates and any framing within 18" of the ground must be pressure treated. Floor framing is 2 x 10 triple girder beams and floor joist spaced at 16" on center. The sub floor is 3/4" tongue and groove and was installed with floor glue and ring shank nails. Wall framing is 9' studs, OSB continuous sheathing on the exterior of building and a vapor barrier. Roof framing consists of 2 x 10 ceiling joist and rafters and is stick framed for maximum storage space. We will be featuring even more on the roofing and siding for this addition and other projects so check back soon. Contact us for a free consultation for your next remodeling project.
Roof framing is being installed

Framing continues at new 24′ X 30′ addition in Chesterfield Co

Here are progress framing photos of an addition project in the Midlothian area of Chesterfield Co. This addition is a 24' x 30'  in-law suite and will include access to the existing living room and kitchen. We are incorporating the existing porch into the new addition space so we need to remove part of the porch floor which will allow a new continuous foundation to be installed. Sill plates and any framing within 18" of the ground must be pressure treated. Floor framing is 2 x 10 triple girder beams and floor joist spaced at 16" on center. The sub floor is 3/4" tongue and groove and was installed with floor glue and ring shank nails. Wall framing is 9' studs, OSB continuous sheathing on the exterior of building and a vapor barrier. We will be featuring even more on the framing of this addition and other projects so check back soon. Contact us for a free consultation for your next remodeling project.
Photo of walls being framed
Wall have been framed and sheathing has been installed